1. Prepare the soil by grading or raking area free of clods and large stones. Do not compact, if using fertilizer, add it to soil before grading.
2. Seeds and mulch (if required) should be distributed evenly over the prepared soil.
3. ANTI-WASH®/GEOJUTE® should be applied by unrolling down the slope or in the direction of water flow.
4. Secure ANTI-WASH®/GEOJUTE® at the top of the slope by toeing it in 6" deep. Reinforce with a row of at least five (5) staples, spacing each about a foot apart, and covering with soil.
5. Place staples 18" to 24" apart throughout to secure matting to ground. All staples must be driven flush with soil surface.
6. Always overlap the edges 2" to 6". At the end of each roll, fold back 4" to 8" of the matting. Overlap this 4" to 8" over the start of the next roll. Securely staple the two layers to the ground.